Can't find a Part

THERMISTER LONG LEAD

THERMISTER LONG LEAD

Part No: WR55X10025

THERMISTER LONG LEAD

Availability: In Stock

Regular Price: $55.00

Special Price $49.50

Quick Overview

THERMISTER LONG LEAD
THERMISTER LONG LEAD
  • Can't find a part or not sure this is the right part please feel free to call us on 03 8373 6044  fill out this enquiry form
  • We only sell genuine spare parts. We do not sell cheap inferior copies.
  • Please refer to our shipping policy for more information about shipping and delievery/dispatch times.
  • Please note that for your safety and the safety of others electrical items should be fitted by an electrically qualified person

Use spaces to separate tags. Use single quotes (') for phrases.

Product Description+
Product Tags +